Free topic check
COORDINATE ATELIER / SAMPLEOriginal crane artwork
Acrosstar 原站仙鹤图,原样保留
ILLUSTRATIVE MODEL · 示例01 — TE
FICTIONAL / 示例01 / 03

01 / Your question

A question is the starting point. This model is a fictional demonstration, not a personal reading.

Sample report

What the written report looks like.

This shows the structure of a Ming Tu written report. The birth details, values and conclusions are fictional and only show the format and depth; in a real report every item comes from your own reading.

Fictional sample: the birth details, readings and conclusions are illustrative. The chart is computed from the sample input with the real method, to show structure; it is no real person.

Chart

Sample input: 1990-03-15 08:20, Toronto (true solar time 08:04)

Hour戊辰Earth · Earth
Day己卯Earth · Wood
Month己卯Earth · Wood
Year庚午Metal · Fire

Elements

Element count (four stems + main qi of four branches, 8 characters)
  1. Wood2
  2. Fire1
  3. Earth4
  4. Metal1
  5. Water0

Windows

3 · Timing windows (next 12 months, example)

  1. Q1–Q2“Shaping”: outside rules tightenContracts, reporting lines, scope of authority
  2. Q3“Supply”: resources flow backSkill investment, cross-team work, building a body of work
  3. Q4“Drain”: friction risesAvoid costly, irreversible changes

Windows describe only the “texture” of outside rhythms. They do not mean any event will happen; your decisions still rest on real-world evidence.

Answers

Should I change jobs now?

Structurally you are in a transition zone; a rushed switch costs more than a well-prepared one at the end of the build-up phase. Evidence to add from real life: do you have at least three transferable assets (measurable results, outside recognition, referees)?

Where does the long-running friction with my partner come from?

You sit opposite each other on “decision speed” and “risk appetite”; the friction comes from different tempos, not different positions. Action: run reversible and irreversible decisions through separate processes.

Sample · all details are fictional

1 · Input check

ItemValue (example)
Birth time (civil)1990-03-15 08:20 local time
Place / time zoneToronto, Canada · America/Toronto
True solar timeLongitude correction −16 minutes
Daylight savingMatched against the IANA historical time-zone database
Solar-term boundaryMore than 12 hours from the term change; month pillar unambiguous

2 · Structure snapshot

DimensionReading (example)Question to check against life
Main modeLeans “constraint → form”: sensitive to structure and limitsUnder what rules do you work best?
Weak linkExpression / outward push is weakerDo ideas often stall before they reach others?
Relationship dynamicsNoticeably higher drain with two kinds of rolesWhich working relationships tire you most each week?
PhaseOn the border of “build-up → transition”Have you often wanted to change but not moved this year?

3 · Timing windows (next 12 months, example)

WindowOutside rhythmDecisions worth watching
Q1–Q2“Shaping”: outside rules tightenContracts, reporting lines, scope of authority
Q3“Supply”: resources flow backSkill investment, cross-team work, building a body of work
Q4“Drain”: friction risesAvoid costly, irreversible changes

4 · Point-by-point responses (example)

Should I change jobs now?

Structurally you are in a transition zone; a rushed switch costs more than a well-prepared one at the end of the build-up phase. Evidence to add from real life: do you have at least three transferable assets (measurable results, outside recognition, referees)?

Where does the long-running friction with my partner come from?

You sit opposite each other on “decision speed” and “risk appetite”; the friction comes from different tempos, not different positions. Action: run reversible and irreversible decisions through separate processes.

Windows describe only the “texture” of outside rhythms. They do not mean any event will happen; your decisions still rest on real-world evidence.