

01 / Your question
A question is the starting point. This model is a fictional demonstration, not a personal reading.
Sample report
What the written report looks like.
This shows the structure of a Ming Tu written report. The birth details, values and conclusions are fictional and only show the format and depth; in a real report every item comes from your own reading.
Fictional sample: the birth details, readings and conclusions are illustrative. The chart is computed from the sample input with the real method, to show structure; it is no real person.
Chart
Sample input: 1990-03-15 08:20, Toronto (true solar time 08:04)
Elements
- Wood2
- Fire1
- Earth4
- Metal1
- Water0
Windows
3 · Timing windows (next 12 months, example)
- Q1–Q2“Shaping”: outside rules tightenContracts, reporting lines, scope of authority
- Q3“Supply”: resources flow backSkill investment, cross-team work, building a body of work
- Q4“Drain”: friction risesAvoid costly, irreversible changes
Windows describe only the “texture” of outside rhythms. They do not mean any event will happen; your decisions still rest on real-world evidence.
Answers
Should I change jobs now?
Structurally you are in a transition zone; a rushed switch costs more than a well-prepared one at the end of the build-up phase. Evidence to add from real life: do you have at least three transferable assets (measurable results, outside recognition, referees)?
Where does the long-running friction with my partner come from?
You sit opposite each other on “decision speed” and “risk appetite”; the friction comes from different tempos, not different positions. Action: run reversible and irreversible decisions through separate processes.
1 · Input check
| Item | Value (example) |
|---|---|
| Birth time (civil) | 1990-03-15 08:20 local time |
| Place / time zone | Toronto, Canada · America/Toronto |
| True solar time | Longitude correction −16 minutes |
| Daylight saving | Matched against the IANA historical time-zone database |
| Solar-term boundary | More than 12 hours from the term change; month pillar unambiguous |
2 · Structure snapshot
| Dimension | Reading (example) | Question to check against life |
|---|---|---|
| Main mode | Leans “constraint → form”: sensitive to structure and limits | Under what rules do you work best? |
| Weak link | Expression / outward push is weaker | Do ideas often stall before they reach others? |
| Relationship dynamics | Noticeably higher drain with two kinds of roles | Which working relationships tire you most each week? |
| Phase | On the border of “build-up → transition” | Have you often wanted to change but not moved this year? |
3 · Timing windows (next 12 months, example)
| Window | Outside rhythm | Decisions worth watching |
|---|---|---|
| Q1–Q2 | “Shaping”: outside rules tighten | Contracts, reporting lines, scope of authority |
| Q3 | “Supply”: resources flow back | Skill investment, cross-team work, building a body of work |
| Q4 | “Drain”: friction rises | Avoid costly, irreversible changes |
4 · Point-by-point responses (example)
Should I change jobs now?
Structurally you are in a transition zone; a rushed switch costs more than a well-prepared one at the end of the build-up phase. Evidence to add from real life: do you have at least three transferable assets (measurable results, outside recognition, referees)?
Where does the long-running friction with my partner come from?
You sit opposite each other on “decision speed” and “risk appetite”; the friction comes from different tempos, not different positions. Action: run reversible and irreversible decisions through separate processes.